Solar Drainage Clearance Calculator
Drainage Clearance Calculator
Verify panel-to-roof clearance prevents ponding and blockage of roof drainage. Adjust any input and the result updates live.
Inputs
Updates livefrom the racking or roofing specification
Results
LiveMinimum drainage clearance
Adequate · no ponding risk
Actual Clearance
mm
Rainwater Flow
m³ / hr
Low ponding risk · Recommendation
Drainage clearance is adequate.
“Water must drain freely under the array: keep the gap your racking or roofing specification requires (150 mm is this calculator's default, not a code figure) and keep the roof's falls clear to the outlets; the 1 % fall in the ponding check is this calculator's guide. Rainwater flow = catchment area × rainfall intensity, all rain assumed to run off. Roof drainage design: NBC 2016 Part 9 (Plumbing Services).”
About the Drainage Clearance
Drainage clearance checks that rainwater can flow freely under a rooftop array to the roof's outlets — modules mounted too close to the roof, or legs that dam the falls, trap water that damages the waterproofing and the mounting.
Last updated · How we build our calculators
Formula
Rainwater flow (m³/h) = catchment area (m²) × rainfall intensity (mm/h) ÷ 1,000
- catchment area
- Roof area draining past the array (m²)
- rainfall intensity
- Design intensity for the site (mm/h)
- minimum clearance
- Gap under the array from the racking or roofing specification (calculator default 150 mm)
How to calculate it
- 1Take the minimum gap under the array from the racking or roofing specification.
- 2Measure the actual gap at the lowest point of the array and compare.
- 3Keep the roof's falls clear to the outlets: no mounting legs, ballast or cable trays across drainage paths, and no blocked outlets.
- 4Estimate the rainwater flow from the catchment area and the design rainfall intensity (all rain assumed to run off) and check the outlets can take it; roof drainage design is in NBC 2016 Part 9.
Worked example
A 200 mm gap against a 150 mm minimum, on a roof with a 2 % fall (the calculator's defaults): adequate, low ponding risk. A 500 m² catchment in 100 mm/h rain gives 500 × 100 ÷ 1,000 = 50 m³/h to the outlets.
What you can calculate
- Minimum gap
- Ponding risk
- Rainwater flow
- Pass/Fail
Standards & references
Frequently asked questions
Does solar panel coverage increase runoff from a rooftop?
The volume is about the same — the same roof area receives the same rain — but panels concentrate it at their drip edges, so flow arrives in lines rather than evenly. Make sure drip-edge flow cannot erode the roof membrane or the ground beneath, and that it reaches the outlets without ponding.
What happens to a solar panel submerged in floodwater?
Modules and outdoor-rated DC cables tolerate short wetting better than other equipment, but inverters are not waterproof and must sit above flood level. Long submersion corrodes frames, junction boxes and mounting hardware, and energised modules in conductive water are a shock hazard. On flood-prone sites, keep modules and electrical equipment above the design flood level.
Ready to build your solar project?
Get free quotes from verified EPCs and installers across India.
You might also need
Pedestal Height
Calculate front and rear pedestal heights for target module tilt on flat rooftops
OpenModule Layout Planner
Plan tables, rows and string configuration for a rooftop array
OpenSetback from Parapet
Calculate minimum module setback from parapet walls to avoid shading
OpenBallast Weight
Calculate ballast required to resist IS 875 Part 3 wind uplift without penetrations
OpenWind Load (Rooftop)
Calculate uplift and lateral wind forces on rooftop PV modules per IS 875 Part 3
OpenAnchor Bolt Sizing
Check anchor bolt steel tension (IS 800) against factored wind uplift and count the bolts
Open